On December 2, Cao Zhenjun ,President of FD Petrol Group Company , presided over production and management experience exchange meeting, in the 3rd floor meeting room.
Non-standard laboratory unit loaded on the truck will be delivered to clients' rig site
Russia's local time on June 27th, the fourteenth Russia international oil and gas exhibition will be held in Moscow, Russia international exhibition center.
In May 29, 2017, FD petrol another batch of prefabricated steel structures was shipped to Iraq in May 30, 2017. The total number of steel structure projects is 300 tons, which is another order following the customer's previous project.
In March 15, 2017, FD Petrol installed three FDLW450-1250N solid control centrifuges for a domestic drilling company to be delivered to the drilling site of the drilling company located in the northwest.